Test Fixtures with Switched Signal Paths: Verify the Selected Route Before Applying Stimulus
Before applying a test stimulus through a switched fixture, establish both the commanded selection and the physical path that selection produced. Keep the route under one owner through stimulus and observation. A selector register reading back the requested channel does not prove that the intended contacts, wiring and load are connected. This is an original…